Who We Are

Consilium Technical Services are a temporary traffic management design & consultancy company, working with traffic management contractors, local authorities, construction contractors & event organisations.

Consilium works across the UK with their design services that include Vehicle Swept Path Analysis, traffic management design for National Highway Sector Scheme 12A, 12B & 12D and drafting services for the civil and construction contractors.

The Consilium team of designers have all come from an installation background in the highways industry. So, it’s safe to say they have the experience and knowledge to produce designs for the end product to work safely and efficiently. Consilium uses the latest software and technology available in the industry to produce the highest standard drawings at competitive rates.

Based in the West Midlands, Consilium work closely with TM contractors in the area, but also have clients from all over the country. Currently, the company’s biggest contract is working with Chevron and Kier on the Highways England network Area 9. This large project is alongside work with Highway Traffic Management- supplying them with all designs for the PFI contract with Amey and Birmingham City Council.

Consilium work with several other TM companies on a regular basis including Premier Traffic Management and DTM Traffic Management to name a few, and have also recently been named as one of the partners on Chevrons BS 11000 Collaborative Business Relationships accreditation. This is along with their ISO 9001 Quality management accreditation and Birmingham Business Charter for Social Responsibility.

Over the past 12 months Consilium have produced more than 7,500 drawings for a variety of schemes. These include 470 high speed relaxed schemes (NHSS12B), 20 high speed static schemes (NHSS12A), thousands of street works (NHSS12D) and 30 Events.

Some big schemes Consilium are extremely proud to have been a part of include:

  • A1 Gateshead – Premier Traffic Management appointed Consilium to help them design various TM layouts for this scheme, working with their client Balfour Beatty including static narrow lanes & contra flows, road closures & diversions and HGV diversions for upgrade works.
  • M6 Gravelly Junction 6 Scheme – Working with Chevron on Area 9, Consilium provided narrow lanes drawings with temporary lane closures for night time works, and road closures and diversions for bridge waterproofing.
  • Great Birmingham Run – Consilium designed TM for the annual event which starts and ends in the centre of Birmingham, going through strategic routes leading to Edgbaston and onto south Birmingham. Working with Highway Traffic Management, The TM included lanes closures, road closures and pedestrian management.
  • A66 Smallways to Greta Bridge – Working with Premier Traffic Management and their client- Tarmac- Consilium produced contraflow TM designs, lane closures and convoy systems for carriageway re-surfacing.